Hi Partners,
Greetings,
Hope you are doing Well!!!!!!!!!!!!!!!
Please forward a profiles to shankar@techconsultinc.com
Here are the requirement details
Minneapolis, MN or Denver, CO
Software Developer
6 months
Summary:
New senior developer required for the Enteprise Project Management initiative. The developer will configure the Skire Unifier system. Integration architect skill set is also required to create the integrations between systems.
General Information:
• Follows company software development lifecycle to design, code, configure, test, debug, and document system and application programs
• Assists in preparing technical design specifications based on functional requirements and analysis documents to customize software to meet application requirements
• Reviews functional requirements, analysis and design documents and provides feedback
• Collaborates with other development staff to achieve quality and consistency
• Participates in architecture, design and code reviews
• Develops and maintains operational and system level documentation. Analyzes systems specifications and designs, develops, modifies, and installs highly complex and customized software
• Actively participate in the escalation of live errors and service problems to limit downtime and resolve problems
• Recognize and solve inconsistencies in the detailed technical specifications and propose changes
• Able to perform in a fast paced & iterative project as a part of a highly interactive team
• Experienced with implementation of packaged software, including highly configurable gui and processing
Specifics:
1) Context around the project this resource will be involved in a project that has selected the Primavera Unifier product from Oracle as their Enterprise Project and Portfolio Management software. As areas within the client are brought onto the tool, the project team identifies how the area will use the tool and then configures the software to meet the requirements.
2) Technology experience required sql, Soap, livecycle are all nice to have.
3) Minneapolis is preferred location but Denver is acceptable.
4) Specific programs/software the candidate needs to be familiar with The Oracle Primavera Unifier application is what the candidate will be working with. There are two components to this application, UDesigner and Unifer. Both of these components are used to configure software to meet the business requirements. No Custom development is needed.
Looking forward to hearing from you at the earliest!!!
Regards
Shankar
Professional Recruiter
33505 State Street, Suite # 200 Farmington, MI 48335
V (248)-522-6879
F (248)-579-4454
Linkedin: www.linkedin.com/in/shkrajan
Email : Shankar@techconsultinc.com
Messanger: shankarraj001@yahoo.com
Minority Certified and Woman Owned Enterprise
TCI- Technology Consultants inc
Note: It is not a solicitation attempt!!!
You received this message because you are subscribed to the Google Groups "ASP._NET_jobs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to asp_net_jobs+unsubscribe@googlegroups.com.
To post to this group, send an email to asp_net_jobs@googlegroups.com.
Visit this group at http://groups.google.com/group/asp_net_jobs.
For more options, visit https://groups.google.com/groups/opt_out.
No comments:
Post a Comment